
Over 95% of Bitcoin's 21M supply mined, next halving 1.05M blocks away
- —Over 95% of the 21M BTC cap has been mined; subsidy is 3.125 BTC per block
- —Next halving at block 1.05M will cut the subsidy to 1.5625 BTC
- —Daily issuance of 450 BTC at 144 blocks/day will fall to 225 BTC
- —Grayscale points to April 2028, though timing depends on block speed
Why it matters: Halving issuance limits the flow of new coins, shaping Bitcoin's long-term supply-demand balance.
Source: TokenPost